Answer:
182 i think
Step-by-step explanation:
2,175 divided by 12 equals
181.25 rounded to 182 because the question talks about an entire day not just a portion of a day, or it does idk
When she met Jason, she gave him 10 pears.
When she met Ben, she gave him of the remaining pears in the basket.
2
If Mdm Ong was left with 5 pears in the basket, how many pears did she have
at first?
Answer:
17
Step-by-step explanation:
That makes it
10+2+5 =17
Answer:
16
Step-by-step explanation:
that makes this type
10+5+2 : 17
Drag and drop the choices into each box to correctly complete the sentences.
The slope for JK¯¯¯¯¯ is , the slope of LK¯¯¯¯¯ is , the slope of ML¯¯¯¯¯¯ is , and the slope of MJ¯¯¯¯¯¯ is . Quadrilateral JKLM a parallelogram because .
*−1/2
*−3/7
*2
*4
*is
*is not
*both pairs of opposite sides are parallel
*only one pair of opposite sides is parallel
*neither pair of opposite sides is parallel
The slope for JK is -3/7, the slope of LK is 2, the slope of ML is -3/7, the slope of MJ is 2. Quadrilateral JKLM is a parallelogram because both pairs of opposite sides are parallel.
Answer:
Look at the picture below for the answers :)
Step-by-step explanation:
Answer:
The two different numbers are 8.211 and 8.209 that round to 8.21 when rounded to the nearest hundredth
Step-by-step explanation:
Given : Number 8.21.
To find : Name two different numbers that round to 8.21 when rounded to the nearest hundredth?
Solution :
To round to the nearest hundredth, we use the thousandths place to determine whether the hundredths place rounds up or stays the same.
We have top round such that number became 8.21.
So, There are two ways to pick the number
1) The thousandths place value is greater than or equal to 5 and hundredths place is 0 then it round to required number.
Example - 8.205,8.206,8.207,8.208,8.209
2) The thousandths place value is less than 5 and hundredths place is 1 then it round to required number.
Example - 8.211,8.212,8.213,8.214
Therefore, The two different numbers are 8.211 and 8.209 that round to 8.21 when rounded to the nearest hundredth
The required hours is 20 hours, where both companies cost the same.
Given that,
The painting company charges $250 base plus $16 per hour. Another painting company charges $210 base plus $18 per hour. How long is a job for which the two companies costs are the same is to be detrmined
Cost price is the price for the buyer pays to the seller for an object or product.
Here,
let the total cost for both the companies be y and the painting hour is x.
The painting company charges $250 base plus $16 per hour.
y = 250 + 16x - - - - - (1)
Another painting company charges $210 base plus $18 per hour.
y = 210 + 18x - - - -- - (2)
Solving equation 1 and equation 2.
250 + 16x = 210 + 18x
2x = 40
x = 20
Put this x in equation 1,
y = 250 + 16 * 20
y = 250 + 320
y = 570
Thus, the required hours is 20 hours, where both companies cost the same.
Learn more about cost price here:
brainly.com/question/11027396
#SPJ2
It’d be 45 minutes hope this helped