The boundary between two plates is known as a tectonic plate boundary.
The widely recognized scientific hypothesis known as plate tectonics states that the Earth's lithosphere is made up of manymajor tectonicplates that have been gently moving since around 3.4 billion years ago.
tectonic plates are formed convection currents are created by the intense heat and pressure that exists within the earth. The tectonic plates that make up the earth's crust shift as a result of these currents.
The tectonic plates move slowly, continuously, and in a variety of directions. Some of them are traveling past each other while others are moving aside from one another.
The border between two tectonic plates called boundary.
To learn more about tectonic plates refer to the link:
#SPJ2
Given:-
Tobecalculated:-
Calculate the pressure exerted on a level ground.
Formulaused:-
Pressure = Force/Area
Solution:-
First of all,
We have to find out Force ;
Force = m × g
Force = 75 kg × 9.8 m/s²
Force = 735 kg.m/s² [ 1 N = kg.m/s² ]
Force = 735 N
Now,
Pressure = Force/Area
Pressure = 735 / 28/1000
Pressure = 735 × 1000 / 28
Pressure = 735000 / 28
Pressure = 26,250 Pascal
B. increase circuit power
.C. allow current flow between its plates.
D. store electric charges.
Answer:
D. Stores electric charges
6 seconds, Frequency=
Answer:
4 times/second
Explanation:
24/6 = 4
THE END
Answer:
rapid diffusion of gas throughout the system
Explanation:
The correct answer of this question is: Work = Force . Distance
EXPLANATION:
The work is said to be done by a body if the force applied on the body has a component along the direction of displacement.
Let us consider a body of mass m.
The body is acted upon by a constant force F . Due to this force, the body undergoes a displacement of S .
Let is the angle between force and displacement.
Hence, the component of force along the direction of displacement is .
The work done by that body is calculated as -
Work done W =
=
= [ ∵
Let .
Hence, work done W = FScos0
= FS [ cos0 = 1]
Hence, the relation between work, force and distance can be written as -
Work = force . distance