Answer:
m=-5
Step-by-step explanation:
Answer:
1 slat every 2 minutes.
Step-by-step explanation:
James is able to paint 2 slats every 5 minutes.
James and Gabe together are able to paint the whole fence (180 slats) in 3 hours and 20 minutes (200 minutes)
The rate of 180 slats in 200 minutes is equal to 18 slats in 20 minutes, and is equal to 9 slats in 10 minutes.
The rate of James is 2 slats in 5 minutes, which is equal to 4 slats in 10 minutes.
Subtracting the rate of James and Gabe together (9 slats in 10 minutes) by the rate of James alone (4 slats in 10 minutes), we have the rate of Gabe, which is 5 slats in 10 minutes, or 1 slat in 2 minutes.
Answer:
1.2 hours
Step-by-step explanation:
Given the following :
Time taken by Adam to shovel driveway = 2 hours
Time taken by BEV to shovel highway = 3 hours
How long will it take them working together
Hence Adam's rate of shoveling per hour :
Reciprocal of time taken = 1/2 per hour
BEV's rate will also be ;
1/ 3 per hour
If both work together ; that is combining the rate :
1/2 + 1/3 = (3 + 2) = 5/6
Combined rate = 5/6
Total fraction of shoveled area = 1:
Time taken = area / rate
= 1 ÷ (5/6)
= 1 × (6 / 5)
= 6/5
= 1 1/5 hours = 1.2 hours