A population is the set of all the data that can be collected and from which a smaller set of data is drawn for further examination. A population may denote to a group of individuals, articles, trials or measurements. A population can thus be called as a collection of information regarding subjects combined together by a common characteristic.
A sample denotes a smaller, controllable form of a larger cluster. It is a subset comprising of the characteristics of a bigger population. Samples are used in statistical experiments when the population under consideration is too large for the test to include all the members.
A parameter is a valuable element of statistical analysis. It denotes the characteristics that are used to define a given population. It is used to define a particular attribute of the population. For instance, population mean, population standard deviation, population proportion and so on.
While making a statistical conclusion about the population under study, the parameter value is unknown. This is because it would not be possible to gather data from every single member of the population. So a sample is selected from the population to derive a conclusion about the parameter.
A statistic is the value of the characteristics that are computed using this sample. For instance, sample mean, sample standard deviation, sample proportion and so on.
The matched pairs are as follows:
Population: 2. All Toyota Camry (2020 US) model cars.
Sample: 4. 117 Toyota Camry (2020 US) cars that are sampled.
Parameter: 7. The average mileage of all Toyota Camry (2020 US) model cars.
Statistics: 6. The average mileage in city for the 117 sampled Toyota Camry (2020 US) cars, that is, 27.8 mpg.
28 to 42 means 28/42
We now reduce 28/42 to lowest terms.
28 ÷ 7 = 4
42 ÷ 7 = 6
We now have 4/6.
We now reduce 4/6.
4 ÷ 2 = 2
6 ÷ 2 = 3
Final answer: 2/3
Answer: The faster one needs 6 hours, the slower one needs 12 hours.
Step-by-step explanation:
Let's define Sa and Sb as the times that each worker needs to stuff the envelopes for a political fundraising letter.
Sa is the faster one
Sb is the slower one.
Let's define 1 as a complete task.
Then:
when they both work together, they need 4 hours:
(1/Sa + 1/Sb)*4h = 1.
The slower one needs 6 more hours than the faster one:
Sb = (Sa + 6h).
We can replace this in the first equation and get:
(1/Sa + 1/(Sa + 6h))*4h = 1.
let's solve this for Sa.
1/Sa + 1/(Sa + 6h) = 1/4h.
(Sa + 6h) + Sa = Sa*(Sa + 6h)/4h.
2*Sa + 6h = Sa^2/4h + Sa*(6/4)
Then we have a quadratic equation:
(1/4h)*Sa^2 - (2/4)*Sa - 6h = 0h
(0.25*1/h)*Sa^2 - 0.5*Sa - 6h = 0h
The solutions come from the Bhaskara equation:
Then we have two solutions:
Sa = ((0.5 + 2.5)/0.5 )h = 6h.
Sb = ( (0.5 - 2.5)/0.5) = -4h
The one that makes sense is the positive option (the negative one has no physical meaning in this situation)
Then the faster worker needs 6 hours to stuff all the envelopes.
And the slower one needs 6h + 6h = 12hours to stuff all the envelopes.
So when they work together, the combined rate is:
(1/6h + 1/12h) = (2/12h + 1/12h) = (3/12h) = (1/4h)
So working together they need 4 hours to stuff all the envelopes.
Answer: a=24
Step-by-step explanation:
Lets find the line's formula (equation of the line).
As known the general formula of any straight line (linear function) is
y=kx+b
Lets find the coefficient k= (Yb-Ya)/(Xb-Xa)=(9-7)/(-4-3)=-2/7
(Xb;Yb)- are the coordinates of point B
(Xa;Ya) are the coordinates of point A
Now lets find the coefficient b. For this purpose we gonna use the coordinates of any point A or B.
We will use A
7=-2/7*3+b
7=-6/7+b
b=7 6/7
So the line' s equation is y= -2/7*x+7 6/7
Now we gonna find the value of a usingcoordinates of point C.
Yc=1, Xc=a
1=-2/7*a+7 6/7
2/7*a= 7 6/7-1
2/7*a=6 6/7
(2/7)*a=48/7
a=48/7: (2/7)
a=24
Answer:
a=24
Step-by-step explanation:
Answer:
936
Step-by-step explanation:
Therefore you multiply 6 by 18 = 6×18= 108
1,044 - 108 = 936
So therefore the total is 936
The cost of each ticket before insurance is $156. This is obtained by subtracting the total cost of the insurance from the total amount spent and then dividing by the number of tickets.
The subject of this question seems to be an exercise in elementary algebra. If a family buys 6 airline tickets online and also purchases travel insurance that costs $18 per ticket, then the amount spent on insurance alone is $18 * 6 = $108. We know that the total cost, including the tickets and the insurance, is $1,044. Therefore, to find out the cost of the tickets alone, we subtract the cost of the insurance from the total cost: $1,044 - $108 = $936, which will be the cost for the tickets alone. So, the cost of each ticket is $936 / 6 = $156. Therefore, each ticket cost $156 before insurance.
#SPJ12
Answer:
The sample size is
Step-by-step explanation:
From the question we are told that
The margin of error is
The standard deviation is
From the question we are told the confidence level is 94% , hence the level of significance is
=>
Generally from the normal distribution table the critical value of is
Generally the sample size is mathematically represented as
=>
=>
a. yes.
b. no.
2. Number of workshops attended.
3. Whether the student passes the course.
a. yes.
b. no.
4. Final exam score Correlation.
Answer:
2. Number of workshops attended.
Step-by-step explanation:
The variable of interest for predicting the final exam score and doing regression analysis is workshop attendance. Therefore, the response variable should be the number of workshops attended by each student.
This also agrees with what the college tutoring center staff are considering, which forms the research question: "should the center increase the number of math workshops they offer to help students improve their performance in math classes?"