Hiring managers should automatically preclude a candidate with a disability if they appear to be unable to do the job.True or false?

Answers

Answer 1
Answer:

Answer:

True

Explanation:

I believe it's true. If we have a job opening for sales personnel and candidate is physically unable to walk or drive, then yes we can exclude that candidate. But once hiring manager is sure of the fact that disability will render that candidate unable to work then manager can preclude that candidate.


Related Questions

Ruth wants to set aside funds to take an around the world cruise in 4 years. Ruth expects that she will need $25500 for her dream vacation. If she is able to earn 9% per annum on an investment, how much will she have to set aside today so that she will have sufficient funds available?
A registered representative wishes to give a speech to a group of 35 potential retail clients at a restaurant. The speech is scripted and is a general discussion about investing in securities. Which statement is TRUE?
A number of activities that are a part of a company's quality control system are listed below: a. Product testing.b. Product recalls. c. Rework labor and overhead. d. Quality circles. e. Downtime caused by defects. f. Cost of field servicing. g. Inspection of goods. h. Quality engineering. i. Warranty repairs. j. Statistical process control. k. Net cost of scrap. I. Depreciation of test equipment. m. Returns and allowances arising from poor quality. n. Disposal of defective products. o. Technical support to suppliers. p. Systems development. q. Warranty replacements. r. Field testing at customer site. s. Product design. Required: 1. Classify the costs associated with each of these activities into one of the following categories: prevention cost, appraisal cost, internal failure cost, or external failure cost. 2. Which of the four types of costs in (1) above are incurred in an effort to keep poor quality of conformance from occurring? Which of the four types or costs in (1) above are incurred because poor quality of conformance has occurred?
A merchandiser has four closing journal entries at the end of an accounting cycle. Select the correct entries below. (Check all that apply.) Close asset accounts. Close the dividends account. Close revenue accounts. Close expense accounts. Close the merchandise inventory account. Close the income summary account.
What is the specific eight-digit Codification citation (XXX-XX-XX-X) that describes the information about loans and trade receivables that is to be disclosed in the summary of significant accounting policies?

The risk premium for exposure to aluminum commodity prices is 4%, and the firm has a beta relative to aluminum commodity prices of .6. The risk premium for exposureto GDP changes is 6%, and the firm has a beta relative to GDP of 1.2. If the risk-free rate is 4%, what is the expected return on this stock?

A.
14.4 percent

B.
10.0 percent

C.
13.6 percent

D.
11.5 percent Please show work

Answers

Answer:

C.  13.6 percent

Explanation:

In this question, we apply the Capital Asset Pricing Model (CAPM) formula which is shown below

Expected rate of return = Risk-free rate of return + Beta × risk-free rate of return + Beta × market risk premium

= 4% + 0.6 × 4% + 1.2 × 6%

=  4% + 2.4% + 7.2%

= 13.6%

The (Market rate of return - Risk-free rate of return)  is also known as market risk premium

In our newly networked world, reading is:A. the taking in of words.
B. a comment
c. a conversation,
D. only about producing words.

Answers

Answer:c

Explanation:

Suppose the reserve requirement (R) is 15%. What is the effect on total checkable deposits in the economy if bank reserves increase by $60 billion. Assume E=0

Answers

Answer:

$400 billion

Explanation:

The computation on the impact on total checkable deposits is shown below

= Increased in the bank reservce ÷ reserve requirement

= $60,000,000,000 ÷ 15%

= $400 billion

Therefore the impact on the total checkable deposits in the case when the bank reserves rises is $400 billion

We simply applied the above formula so that the correct value could come

And, the same is to be considered

A company plans to enclose three parallel rectangular areas for sorting returned goods. The three areas are within one large rectangular area and yd of fencing is available. What is the largest total area that can be​ enclosed

Answers

Answer:

A lot of information is missing, so I looked for similar questions:

  • 1,064 yd of fencing is available

since 1,064 is the perimeter and we have a rectangle, we can write the perimeter equation as: 2L + 2W = 1,064

area = L · W

2W = 1,064 - 2L

W = 532 - L

now we replace in the area equation:

area = (532 - L) · L = -W² + 532W (quadratic equation format)

the value of L as our X coordinate:

L = 532 / 2 = 266

W = 532 - 266 = 266

area = -(266)² + (532 x 266) = -70,756 + 141,512 = 70,756 sq yards

or

area = 266 · 266 = 70,756 sq yards

When you have a rectangle, the largest possible area is a square, where both sides have the same length.

Jayhawk had previously purchased merchandise for $40,000 The company returned $4,000 of the merchandise previously purchased because it was damaged. . The journal entry that Jayhawk would make for the return of the merchandise will include a:

Answers

Answer:

the options are missing, but I wrote down the two possible answers

the journal entry to record the purchase assuming perpetual inventory method:

Dr Merchandise inventory 40,000

    Cr Accounts payable 40,000

the journal entry to record the damaged merchandise assuming perpetual inventory method:

Dr Accounts payable 4,000

    Cr Merchandise inventory 4,000

OR

the journal entry to record the purchase assuming periodic inventory method:

Dr Purchases 40,000

    Cr Accounts payable 40,000

the journal entry to record the damaged merchandise assuming periodic inventory method:

Dr Accounts payable 4,000

    Cr Purchases returns 4,000

Primara Corporation has a standard cost system in which it applies overhead to products based on the standard direct labor-hours allowed for the actual output of the period. Data concerning the most recent year appear below: Total budgeted fixed overhead cost for the year $ 250,000 Actual fixed overhead cost for the year $ 254,000 Budgeted direct labor-hours (denominator level of activity) 25,000 Actual direct labor-hours 27,000 Standard direct labor-hours allowed for the actual output 26,000 Required: 1. Compute the fixed portion of the predetermined overhead rate for the year. (Round Fixed portion of the predetermined overhead rate to 2 decimal places.) 2. Compute the fixed overhead budget variance and volume variance. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance.). Input all amounts as positive values.)

Answers

Answer:

1. The fixed portion of the predetermined overhead rate for the year is $10,000 per direct labor hour.

2. The fixed overhead budget variance is $4,000 unfavourable and the fixed overhead volume variance is $10,000 favourable.

Explanation:

In order to calculate the the fixed portion of the predetermined overhead rate for the year we would have to use the following formula:

predetermined overhead rate for the year=Total fixed overhead cost year

                                                                          Budgeted direct labor-hours

                                                                     =$ 250,000/25,000

                                                                      =$10,000

1. The fixed portion of the predetermined overhead rate for the year is $10,000 per direct labor hour.

In order to calculate the fixed overhead budget variance, we use the following formula:

2. fixed overhead budget variance=Actual fixed overhead cost for the year- budgeted fixed overhead cost for the year

                                                     =$ 254,000-$ 250,000

                                                     =$4,000 unfavourable

In order to calculate the fixed overhead volume variance, we use the following formula:

fixed overhead volume variance=budgeted fixed overhead cost for the year-fixed overhead appliead to work in process

                                                     =$ 250,000-(26,000×10)

                                                     =$10,000 favourable

Other Questions