brennan is correct and ilene is not
Answer:
y+5==4(x+2) this is point slope form
Step-by-step explanation:
Answer:
77.5 mph and 82.5 mph
Step-by-step explanation:
Let's say the speeds of the trains are x and x + 5.
The combined distance traveled by the trains is 480 miles.
480 = x × 3 + (x + 5) × 3
480 = 3x + 3x + 15
480 = 6x + 15
465 = 6x
x = 77.5
The speeds of the trains are 77.5 mph and 82.5 mph.
We can model the problem as follows: on a number line we put train A, with positive speed , at the origin x=0.
At x=480 we put train B, with negative speed .
So, the equations for the positions of the two trains are
We know that , so we can rewrite the first equation:
The two trains meet when they are at the same position:
We know that this happens after 3 hours, i.e. when t=3:
And since train A was 5 mph faster, we have