What is 130/14 equal to what

Answers

Answer 1
Answer: it is equal to 9.285714286
dose this help?
Answer 2
Answer: You can change it to a improper fraction:
130÷14= 9 r4
9 4/14 or 9 2/7
So the answer is 9 2/7.
~JZ
Hope it helps

Related Questions

PLEASE HELP QUICK!!!!!!
What is the value of P for the following triangular prism?
How would you figure this out I don't know how ​
I need the volume for 9,11,and 13
What is the area of the kite ​

A town in east Texas received 10 inches of rain in two weeks. If it kept raining at this rate for a 31-day month, how much rain did the town receive?

Answers

If it rained 10 inches in 14 days, then it seems that it rained 10/14 or 5/7 inches of rain per day hypothetical. And since you want to see how many inches it rained in 31 day, multiply 5/7 by 31 and you get about 22.1 inches of rain. Hope this helps. 

of the 50 U.S states, 4 have names that start with the letter W. What percentage of U.S. states have names that start with the letter W?

Answers

Answer:

8% of of the Us states have the names that start with W.

Step-by-step explanation:

We are told that, of the 50 states, 4 have names that start with letter W, and to figure out what percentage of U.S. states have names that start with the letter W, we need to know what what 4 is what percent of 50.

We figure this out the following way:

Percent = (4)/(50) *100=0.08*100 =8

Percent = 8%

47% of 70 estimated ????? help pleazzz

Answers

In summary, you just multiply the percentage (move the decimal twice to the left) by the amount, which is 70 in this case.

0.47 x 70 = 32.9

Nine thousand, six hundred five and nine tenths

Answers

Hello,

Nine thousand, six hundred five and nine tenths = 9,605.9

Have A Good Day.

9,605.9 would have to be the answer

Find an equation of a line that pass through (4,3) and parallel to y=-4x+1

Answers

Answer:

y = -4x + 19

Step-by-step explanation:

The line parallel to y = -4x + 1 would have the same slope of -4. The coefficient of x will be -4. We can put this into the equation y = -4x + a where a is the y-intercept and a ≠ 1. Now solve for a.

y = -4x + a

plug in 4 for x and 3 for y

3 = -4(4) + a

simplify

3 = -16 + a

+16 both sides

19 = a

a = 19

y = -4x + 19

A work crew of 3 people requires 3 weeks and 2 days to do a certain job. How long would it take a work crew of 4 people to do the same job if each person of both crews works at the same rate as each of the others. [Note: each week contains six work days]Thanks for the help!

Answers

It would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

To solve this problem, we can start by calculating the total work done by the original work crew of 3 people in terms of "work-weeks." We know that they require 3 weeks and 2 days to complete the job.

1 week = 7 days

So, 3 weeks and 2 days can be converted to days as follows:

3 weeks + 2 days = 3 weeks + (2/7) weeks

≈ 3 weeks + 0.2857 weeks

≈ 3.2857 weeks

Now, we know that the original work crew of 3 people completes the job in 3.2857 work-weeks.

Next, we can calculate the amount of work done by each person of the original crew per work-week:

Work done by 1 person in 1 week = 1/3 of the total work (as there are 3 people)

Work done by 1 person in 1 work-week ≈ 1/3.2857

Now, we want to find out how much work a single person of the new work crew of 4 people can do in 1 work-week. Since each person in both crews works at the same rate, the work done per person per week will be the same.

Work done by 1 person in 1 work-week ≈ 1/3.2857 ≈ 0.3043

Now, we know that a single person from the new crew can complete approximately 0.3043 of the total job in one work-week.

Finally, we want to find out how long it will take for the new work crew of 4 people to complete the entire job. Let's denote the time in weeks as "x."

Total work done by the new crew of 4 people = 4 people * x weeks * 0.3043 work done per person in 1 week

Total work done by the new crew of 4 people = 1 job (as they will complete the entire job)

So, we have the equation:

4x * 0.3043 = 1

Now, solve for "x":

x ≈ 1 / (4 * 0.3043)

x ≈ 0.8225

Therefore, it would take a work crew of 4 people approximately 0.8225 weeks to do the same job. To convert this into days:

0.8225 weeks * 7 days/week ≈ 5.7575 days

So, it would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

For more details of  work crew:

brainly.com/question/20323478

#SPJ2

20  days per 3 people         for 4 people


20/3 * 4 = 26 & 2/3 days