How many centimeters are in 4.5 meters

Answers

Answer 1
Answer: There are 450 centimeters in 4.5 meters, next time try moving the decimal point over 2 places and adding a zero. 
Answer 2
Answer: 1 cm= 0.01m \n\n 4.5m \to \boxed{450 cm}

Related Questions

Help asap please :))))))
Identify describe and extend each pattern 64,55,46,37,28,19
So there were Total of 3 football games a month and 9 were played at night the season is played for 4 months how many games are in the season
5. Kalen is trying to find the average of three measurements. The measurements are 13.8, 15.64, and 22.51. He adds thenumbers and divides by three. The result on the calculator shows 17.3167. Where should Kalen round? Explain.
The scale on a drawing is 3 in.:4 ft. The actual length of the object is 24 feet. How many inches is the length of the object on the drawing?

This year Moises has read 24 books. 16 of the books were non-fiction and the rest were fiction. What is the ratio to non-fiction books Moises has read this year?

Answers

Your answer is 6:4 Hope this helps.

4. Jeff put a small box is 12 inches long 8 inches wide and 4 inches tall inside a box that is j 20 inches long 15 inches wide and 9 inches high How much space is in the larger box

Answers

The answer is :
20 x 15 x 9 - 12 x 8 x 4
=2700-384
=2316

Jill wants to find the quotient use multiplication and distributive property to help Jill find the quotient of 144 divided by 8

Answers

144 divided by 8 equals 18

Does the equation represent a linear or nonlinear function explain 2x+3y=7

Answers

linear, because there is still a slope function (-2/3)

The equation is linear because you can rewrite it in slope-intercept form.

A work crew of 3 people requires 3 weeks and 2 days to do a certain job. How long would it take a work crew of 4 people to do the same job if each person of both crews works at the same rate as each of the others. [Note: each week contains six work days]Thanks for the help!

Answers

It would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

To solve this problem, we can start by calculating the total work done by the original work crew of 3 people in terms of "work-weeks." We know that they require 3 weeks and 2 days to complete the job.

1 week = 7 days

So, 3 weeks and 2 days can be converted to days as follows:

3 weeks + 2 days = 3 weeks + (2/7) weeks

≈ 3 weeks + 0.2857 weeks

≈ 3.2857 weeks

Now, we know that the original work crew of 3 people completes the job in 3.2857 work-weeks.

Next, we can calculate the amount of work done by each person of the original crew per work-week:

Work done by 1 person in 1 week = 1/3 of the total work (as there are 3 people)

Work done by 1 person in 1 work-week ≈ 1/3.2857

Now, we want to find out how much work a single person of the new work crew of 4 people can do in 1 work-week. Since each person in both crews works at the same rate, the work done per person per week will be the same.

Work done by 1 person in 1 work-week ≈ 1/3.2857 ≈ 0.3043

Now, we know that a single person from the new crew can complete approximately 0.3043 of the total job in one work-week.

Finally, we want to find out how long it will take for the new work crew of 4 people to complete the entire job. Let's denote the time in weeks as "x."

Total work done by the new crew of 4 people = 4 people * x weeks * 0.3043 work done per person in 1 week

Total work done by the new crew of 4 people = 1 job (as they will complete the entire job)

So, we have the equation:

4x * 0.3043 = 1

Now, solve for "x":

x ≈ 1 / (4 * 0.3043)

x ≈ 0.8225

Therefore, it would take a work crew of 4 people approximately 0.8225 weeks to do the same job. To convert this into days:

0.8225 weeks * 7 days/week ≈ 5.7575 days

So, it would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.

For more details of  work crew:

brainly.com/question/20323478

#SPJ2

20  days per 3 people         for 4 people


20/3 * 4 = 26 & 2/3 days

a rectangle has an area of  42 square inches which has a greater perimeter the rectangle with the dimensions 21 times 2 or the dimensions 6 times 7

Answers

A= 42in²
P = 2l + 2w so
(21 x 2) + (2 x 2)
42 + 4 = 46
46 = 21 by 2

Now let's do 6 and 7
(6 x 2) + (7 x 2)
12 + 14 = 26

46 > 26
so 21 by 2 has greater P (perimeter)
21times 2 because it takes more work