Answer: The number is 5.
Step-by-step explanation:
First, let d be our number.
Since we know that d is our number, we rewrite the expression this way:
3 times d incresed by 15 is 30.
3 times d is 3d; 3d increased by 15 => 3d + 15. This equals 30:
3d + 15 = 30
To solve for d, subtract 15 from both sides:
3d = 15
Next, divide both sides by 3:
d = 5
Answer:
81, 82, 83, 84.
Step-by-step explanation:
Let x represent 1st integer. Then the next three consecutive integers would be .
We have been given that twice the sum of the two greater integers exceeds three times the first by 91. We can represent our given information in an equation as:
Let us solve for x.
Therefore, the 1st integer would be 81.
The next three consecutive integers would be:
Therefore, our required four consecutive integers are 81, 82, 83, 84.
To find four consecutive integers, set up an equation using the given information and solve for x. The four consecutive integers are -86, -85, -84, and -83.
To find four consecutive integers, we can let the first integer be x. The next three consecutive integers would then be x+1, x+2, and x+3. According to the given condition, twice the sum of the two greater integers (x+2 + x+3 = 2x+5) exceeds three times the first integer (3x) by 91. So, we can set up the equation 2x+5 = 3x + 91 and solve for x.
Subtracting 2x from both sides yields 5 = x + 91. Subtracting 91 from both sides gives -86 = x. Therefore, the four consecutive integers are -86, -85, -84, and -83.
#SPJ3
No.
When trying to analyze an overall satisfaction with Quality of service. The number of population he is analyzing should not be limited to a certain factor. This would cause a narrow data information gather and would not represent the entire population. The surveys should be based randomly to avoid data bias/filters and actual results would be realistic.
(4w2 - 7w - 6) - (8w2 + 2w - 3)
Choose one answer.
a. -4w2 - 9w - 3
b. 12w2 + 9w + 3
c. -4w2 - 5w - 9
d. 12w2 - 5w - 9
Answer:
The painter spent 26 hours painting the house.
Step-by-step explanation:
If the painter charged $ 950 for painting a house, and he charges $ 35 per hour plus $ 40 for the ladder rental, in order to determine how many hours of work it took to paint the house, we must make the following calculation:
950 (total charge) - 40 (ladder rental) = Total work charge
910 (total charge per work) / 35 (charge per hour) = Total hours of work
910 / 35 = 26
It took 26 hours to the painter for painting the entire house.