Answer:
Step-by-step explanation:
Total cost = 1.9* 40 = 76.0 = $76
When unit rate is given,multiply.
The total cost of 1.9 cubic meters of soil is $76. This is calculated by multiplying the amount of soil bought (1.9 cubic meters) by the cost of one cubic meter of soil ($40).
To calculate the total cost, we have to multiply the amount of soil bought (in cubic meter) by the cost of one cubic meter of soil. Here, the student is buying 1.9 cubic meters of soil and the cost of one cubic meter of soil is $40.
So, Total cost = amount of soil * cost of one cubic meter of soil
= 1.9 * 40
= $76
Therefore, the total cost of 1.9 cubic meter of soil is "$76."
#SPJ2
Answer: 7
Step-by-step explanation:
Given:Henry and 28 classmates go to the roller skating rink .
⇒ Total classmates=1+28=29
Capacity of van=11 students
To find the number of students are in van which is not full, we need to divide total students by capacity of van
On dividing 29 by 11 we get,
Quotient=2, Remainder=7
As 29=2×11+7
Therefore number of vans which are full =2
the number of students remains after 2 van which are full=7
⇒ The number of students are in the van not full=7
((3+7)/2) can be used to find the x-coordinate of the point.
((-1-6)/2) can be used to find the y-coordinate of the point.
(–7 – 3) + 3 can be used to find the x-coordinate of the point.
(–6 – 1) – 1 can be used to find the y-coordinate of the point.
– 1 can be used to find the y-coordinate of the point.