Answer: The answer is 2
Im from k12
Step-by-step explanation:
According to question , population = 10,000,000 people & so census is taken , Hence 10,000,000 are sampled !
Step-by-step explanation:
Here we have , If a population consists of 10,000,000 people and census is taken, We need to find how many people are sampled . Let's find out:
The decision by consensus is a decision process that seeks not only the agreement of the majority of the participants, but also pursues the objective of resolving or mitigating minority objections to reach the most satisfactory decision. At the same time consensus means: a) a general agreement, b) a process to reach that agreement. Decision-making by consensus is primarily about the process. Since , census is taken that means all the available population is sampled ! According to question , population = 10,000,000 people & so census is taken , Hence 10,000,000 are sampled !
please hurry.
k=273.15+c
that's one of them
Three vertices of a rectangle are (–3, 4), (5, 4), and (5, –2). A. (–3, –4) B. (–3, –2) C. (5, –3) D. (5, 2)
Scatter plot on a first quadrant coordinate grid. The horizontal axis is labeled Variable A. The vertical axis is labeled Variable B. Points are plotted at (one, two), (two, nine), (three, five), (four, seven), (five, three), (six, eight), (seven, six), (eight, seven), (nine, ten). A line is drawn through point (six, eight) and point (eight, seven).
Scatter plot on a first quadrant coordinate grid. The horizontal axis is labeled Variable A. The vertical axis is labeled Variable B. Points are plotted at (one, two), (two, nine), (three, five), (four, seven), (five, three), (six, eight), (seven, six), (eight, seven), (nine, ten). A line is drawn through point (three, five) and point (five, three).
Scatter plot on a first quadrant coordinate grid. The horizontal axis is labeled Variable
a. The vertical axis is labeled Variable B. Points are plotted at (one, two), (two, nine), (three, five), (four, seven), (five, three), (six, eight), (seven, six), (eight, seven), (nine, ten). b. line is drawn through point (one, two) and point (three, ten).
Scatter plot on a first quadrant coordinate grid. The horizontal axis is labeled Variable c. The vertical axis is labeled Variable B. Points are plotted at (one, two), (two, nine), (three, five), (four, seven), (five, three), (six, eight), (seven, six), (eight, seven), (nine, ten). d. line is drawn through point (one, two) and point (nine, ten).
Answer:
Image attached is your answer.
Step-by-step explanation:
Hope this helps all who have struggled to find the answer.
Distance =
Note: Round your answer to the nearest hundredth.
Answer:
look at the picture above
27. y-8=15. (hint: add 8 to -15. -15+8= -7 -7-8=-15
28. a+27.7= -36.6 (again add 27.7 to -36.6
sorry i couldnt help more its a bit hard im working on it