Show all your work please
Answer:
19,683
Step-by-step explanation:
3^2 is equal to (3*3) which equals 9 since the base is being multiplied by itself 2 times.
so lets work this out
3^2= 9
3^3=27
3^4=81
you multiply 27 * 9 which equals 243
then, multiply 243 by 81 which equals 19,683!!!
Answer:
The answer is 8/9.
Step-by-step explanation:
Turn 2 1/2 in to 3/2 and turn 1 1/3 in to 4/3 then turn 3/2 int 2/3 and multiply 2/3 by 4/3 and you get 8/9.
Hope this helped. have a nice day!
Can i have brainlyest so i can get to the next rank?
Answer:
Mason's and Eric's
Step-by-step explanation:
We are given that:
Olivia has 18 marbles ,Mason has 24 marbles,Nia has 63 marbles,and Eric has 75 marbles.
Each person packed their marbles in groups of 9.
We have to find who will have marbles left over.
Olivia has 18 marbles which can be packed as (9+9=18)
Mason has 24 marbles which can be packed as (9+9=18 and 6 will be left unpacked)
Nia has 63 marbles which can be packed as (9+9+9+9+9+9+9=63)
and Eric has 75 marbles which can be packed as (9+9+9+9+9+9+9+9=72 and 3 will be left unpacked)
Hence, Mason's and Eric's marbles are left unpacked
It would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.
To solve this problem, we can start by calculating the total work done by the original work crew of 3 people in terms of "work-weeks." We know that they require 3 weeks and 2 days to complete the job.
1 week = 7 days
So, 3 weeks and 2 days can be converted to days as follows:
3 weeks + 2 days = 3 weeks + (2/7) weeks
≈ 3 weeks + 0.2857 weeks
≈ 3.2857 weeks
Now, we know that the original work crew of 3 people completes the job in 3.2857 work-weeks.
Next, we can calculate the amount of work done by each person of the original crew per work-week:
Work done by 1 person in 1 week = 1/3 of the total work (as there are 3 people)
Work done by 1 person in 1 work-week ≈ 1/3.2857
Now, we want to find out how much work a single person of the new work crew of 4 people can do in 1 work-week. Since each person in both crews works at the same rate, the work done per person per week will be the same.
Work done by 1 person in 1 work-week ≈ 1/3.2857 ≈ 0.3043
Now, we know that a single person from the new crew can complete approximately 0.3043 of the total job in one work-week.
Finally, we want to find out how long it will take for the new work crew of 4 people to complete the entire job. Let's denote the time in weeks as "x."
Total work done by the new crew of 4 people = 4 people * x weeks * 0.3043 work done per person in 1 week
Total work done by the new crew of 4 people = 1 job (as they will complete the entire job)
So, we have the equation:
4x * 0.3043 = 1
Now, solve for "x":
x ≈ 1 / (4 * 0.3043)
x ≈ 0.8225
Therefore, it would take a work crew of 4 people approximately 0.8225 weeks to do the same job. To convert this into days:
0.8225 weeks * 7 days/week ≈ 5.7575 days
So, it would take a work crew of 4 people approximately 5 days and 18 hours to complete the same job if each person in both crews works at the same rate as each other.
For more details of work crew:
#SPJ2