Answer:
10.8 units
Step-by-step explanation:
Answer:
10.8
Step-by-step explanation:
Its True
What is the value of q
B.2
C.2 2/3
D.4
Evaluate the expression for the given values
mx−y when m=2, x=7, and y=5
put your answer below
The required cost of the concrete project is given as $740.7.
Volume is defined as the mass of the object per unit density while for geometry it is calculated as profile area multiplied by the length at which that profile is extruded.
Here,
The volume of the slab is given as,
= length × width × height
= 10 × 12 × 4/12
= 40 cubic feet,
Now,
The cost of a concrete slab is given by
= Total volume (cubic foot) x $500/27
= 40 × 500 / 27
= $740.7
Thus, the required cost of the concrete project is given as $740.7.
Learn more about Volume here:
brainly.com/question/1578538
#SPJ3
Answer:
Not sure if this is correct but i believe the price would be $20,000
Step-by-step explanation:
Yoour perimeter is 120ft and it is 1/3 of a foot. So i did 120/3 and i got 40. The 40 is how many square feet you will need. you do 40x500 and i got $20,000. Sorry if this is wrong as i was kind of confused for a moment
The mode is the number that appears most in a set of numbers.
Put the set in numerical order, from least to greatest.
5, 8, 10, 10, 10, 11, 12, 12, 14, 17, 17,18, 19, 20, 20, 21
5 - |
8 - |
10 - |||
11 - |
12 - ||
14 - |
17 - ||
18 - |
19 - |
20 - ||
21 - |
There are three 10s, whereas there's only two or less sets of all the other numbers.
The mode of the data set is 10.