Which equation represents the line shown on the graph?
Which equation represents the line shown on the graph? - 2

Answers

Answer 1
Answer: The answer is y=-x+2
Answer 2
Answer:

Answer:y=-x+2

Step-by-step explanation:


Related Questions

In some division problems, a number or pattern of number that continues indefinitely is a?
What is the missing term? Please help me
Please help me! Determine the area
In a random sample of 500 college students, 23% say that they read or watch the news every day. Develop a 90% confidence interval for the proportion of all students who read or watch the news on a daily basis. Interpret your results. If you wanted to develop a 95% confidence interval with a margin of error of .01, how many students would need to be surveyed?
4 tons of cement cost $480.00. What is the price per pound?

If f(x) = 2x^2+ 1 and g(x)= x^2-7, find (f-g)(x)

Answers

Answer:

2x squared +1 (-)x squared -7 is

a.) x squared +8

Step-by-step explanation:

:)

Given the age in years, t, of a water-transport pipe, the formula R = 17 + 4 t can be used to predict the rate of water leakage (in gallons per minute) from the pipe as it carries water from the headquarters of a farming cooperative to farmland a mile away. What is the meaning of the constant 17 in the function R ?A. Initially the pipe leaks at 4 gallons per year.
B. Initially the pipe leaks at 17 gallons per year.
C. Initially the pipe leaks 17 gallons.
D. Initially the pipe leaks at 4 gallons per minute.
E. Initially the pipe leaks 4 gallons.
F. Initially the pipe leaks at 17 gallons per minute.

Answers

Answer: F. Initially the pipe leaks at 17 gallons per minute.

Step-by-step explanation:

Given the equation below:

R = 17 + 4t

Where R is the rate of leakage in gallons per minute,

And t is the age of pipe in years.

The rate of leakage at time t = 0 ( initial rate of leakage )

R(0)= 17 + 4(0)

R(0)= 17 gallons per minute.

Therefore the initial rate of leakage is 17gallons per minute

Final answer:

The constant 17 in the function R = 17 + 4t represents the initial rate of water leakage from the pipe when it is brand new. The correct answer is option C. Initially the pipe leaks 17 gallons.

Explanation:

The constant 17 in the function R = 17 + 4t represents the initial rate of water leakage from the pipe when it is brand new. This means that option C. Initially the pipe leaks 17 gallons is the correct answer.

Learn more about initial rate of water leakage here:

brainly.com/question/33844193

#SPJ3

You are relieved from your position as a machine operator at the plant at 11:25 for a 50-minute lunch break. When must you begin working again.

Answers

Answer:

12:15

Step-by-step explanation:

Savannah recorded the average rainfall amount, in inches, for two cities over the course of 6 months.City A: {4, 3.5, 5, 5.5, 4, 2}
City B: {5, 6, 3.5, 5.5, 4, 6}
(a) What is the mean monthly rainfall amount for each city?
(b) What is the mean absolute deviation (MAD) for each city? Round to the nearest tenth.
(c) What is the median for each city?

Answers

Answer:

City A: {2, 3.5, 4, 4, 5, 5.5}

City B: {3.5, 4, 5, 5.5, 6, 6}

Mean is the average.

Average of City A = 4 (2+3.5+4+4+5+5.5 = 24 and 24/6 = 4)

Average of City B = 5 (3.5+4+5+5.5+6+6 = 30 and 30/6 = 5)

Mean Absolute Deviation

Mean Absolute Deviation of City A = 0.8

Mean Absolute Deviation of City B = 0.8

Median is the middle (after putting it in order least to greatest)

Median of City A = 4

Median of City B = 5.25 (5+5.5 = 10.5 and 10.5/2 =5.25)

Step-by-step explanation:

hope this helps!

Simran waited 3 1/2 hours for her car to get repaired.what is 3 1/2 written as a decimal

Answers

3.5 is 3 and one half




Fun fact
Banana

Answer:

3.5

Step-by-step explanation:

im a sophmore and i know this

19. Round the number 347 500 to the nearest 1000; 10 000 and 100 000.To the nearest 1000
To the nearest 10 000
To the nearest 100 000

Answers

Answer:

34800, 350000, 300000

Step-by-step explanation:

5>=5

34800

7>=5

350000

4<=5

300000

Other Questions