The amount of meters left is 0.144 meters
First and foremost, it should be noted that: 1 yard = 0.9144 meter
Therefore, 10 yards to meters will be:
= 0.9144 × 10
= 9.144 meters
Since Allison uses 9 meters, the amount of thread that is left on the
spool will be:
= 9.144 meters - 9 meters
= 0.144 meters
Read related link on:
Answer:
-20, -19
Step-by-step explanation:
The average of the two numbers is -39/2 = -19.5. The smaller number is 0.5 less than this, -20, and the larger number is 0.5 more than -19.5, so is -19.
_____
Comment on the problem and solution
I find that working consecutive integer problems is often simplified by working with the average value of those integers:
b. What is the percentile for a day in August with a high temperature of 75 degrees F?
c. What is the 75th percentile for the daily high temperature for the month of August?
d. What is the interquartile range for the daily high temperature for the month of August?
Answer:
a)
b)
So then 75 F correspond to approximately the 37 percentile
c)
And if we solve for a we got
So the value of height that separates the bottom 75% of data from the top 25% is 84.07 F.
d)
See explanation below.
Step-by-step explanation:
Previous concepts
Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".
The Z-score is "a numerical measurement used in statistics of a value's relationship to the mean (average) of a group of values, measured in terms of standard deviations from the mean".
Part a
Let X the random variable that represent the daily high temperature in Chicago for the month of August of a population, and for this case we know the distribution for X is given by:
Where and
We are interested on this probability
And the best way to solve this problem is using the normal standard distribution and the z score given by:
Using the z score we got:
Part b
For this case we can find the percentile with the following probability:
If we use the z score formula we got:
So then 75 F correspond to approximately the 37 percentile
Part c
For this part we want to find a value a, such that we satisfy this condition:
(a)
(b)
Both conditions are equivalent on this case. We can use the z score again in order to find the value a.
As we can see on the figure attached the z value that satisfy the condition with 0.75 of the area on the left and 0.25 of the area on the right it's z=0.674. On this case P(Z<0.674)=0.75 and P(z>0.674)=0.25
If we use condition (b) from previous we have this:
But we know which value of z satisfy the previous equation so then we can do this:
And if we solve for a we got
So the value of height that separates the bottom 75% of data from the top 25% is 84.07 F.
Part d
For this case we know that
So then we just need to find the percentile 25.
(a)
(b)
Both conditions are equivalent on this case. We can use the z score again in order to find the value a.
As we can see on the figure attached the z value that satisfy the condition with 0.25 of the area on the left and 0.75 of the area on the right it's z=-0.674. On this case P(Z<-0.674)=0.25 and P(z>-0.674)=0.75
If we use condition (b) from previous we have this:
But we know which value of z satisfy the previous equation so then we can do this:
And if we solve for a we got
So the value of height that separates the bottom 25% of data from the top 75% is 71.93 F.
So then the interquartile range would be:
Answer:
(C) 25,35 and 175,35
B. 70
C. 55
D. 35
Answer:
A. 90
Step-by-step explanation:
Since the 2 lines on the left are parallel, they both will line up. Also the other answers don't make sense
Step-by-step explanation:
1350÷600
=2.25
√2.25=1.5