Answer:
10.506
Step-by-step explanation:
its just adding and math lol- if u dont trust it look it at a calculator- hope this helped!!<3
Answer:
2 * x^2
Step-by-step explanation:
in word form: two times the square of x
"a number" can be any variable; i used x
Answer:
x² × 2
Step-by-step explanation:
Notice vocabulary:
Put this information together.
"Twice the square of a number"
Since it says of a number, this number comes first →
"Twice the square of a number"
The square of a number means that the variable will be squared →
"Twice the square of a number"
Multiply the variable by a factor of two →
:Done
Answer:
a)The data shows a downward trend pattern
Step-by-step explanation:
See attached images
In simple linear regression, the parameters for the line that minimizes the MSE can be found. To determine if a regression model suggests a goal is being met, compare predicted values to the goal value.
In simple linear regression analysis, the parameters for the line that minimizes the Mean Squared Error (MSE) can be found. The y-intercept (b0) and slope (b1) of the line can be calculated using the data. To determine if the regression model suggests that a goal is being met, you would compare the predicted values from the regression model to the goal value. If the predicted values are less than or equal to the goal value, then the goal is being met.
#SPJ3
Answer:
t=175÷p
Step-by-step explanation:
t is equal to 175 divided by p
Answer:45 steps
Step-by-step explanation:all u have to do is add all that he climbed which is 30+ 15
Answer 45
Step-by-step explanation:
30 + 15 = 45
Answer:
52.79% of examinees will complete the exam on time.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
There are 35 questions. The psychologist expects that an examinee will spend an average of 1.66 minutes answering each question, with a standard deviation of 0.73 minutes. This means that the mean and the standard deviation for the time to complete the test is .
What proportion of examinees will complete the exam on time?
The time allowed for the exam is 60 minutes. So this proportion is the pvalue of Z when . So:
has a pvalue of 0.5279.
This means that 52.79% of examinees will complete the exam on time.
Answer:
7
Step-by-step explanation:
To solve this, we have to solve for h.
We can use order of operations to figure this one out.
Now that every variable on the left side of the equation has an h, we can factor.
Answer:
6
I just did some trial and error with the numbers
186-96-76+3=17
Unless I did it wrong, then just ignore this answer