Answer:
7.29%
Explanation:
The computation of the current yield of the bond is shown below;
Current yield is
= (Par value × annual coupon rate) ÷ Selling price of the bond
= ($1,000 × 7.2%) ÷ $988.22
= $72 ÷ $988.22
= 7.29%
Hence, the bond current yield is 7.29%
This is to be computed by applying the above formula so that the current bond yield could arrive
Revenue Expenses
(A) $18,600,000 $18,750,000
(B) $4,650,000 $ 4,687,500
(C) $4,650,000 $ 5,250,000
(D) $4,687,500 $ 4,687,500
Answer:
(C) $4,650,000 $ 5,250,000
Explanation:
total contract price is $ 18,600,000
season construction using percentage of completion method.
Amount of revenue & construction expense for the year ended december 31, 2020 will be
25% of $ 18,600,000 revenue = $ 4,650,000
25% of $ 18,750,000 total cost = $5,250,000
Interest rate Fiscal year-end Interest expense
12% December 31
10% September 30
9% October 31
6% January 31
Answer:
In accrual basis accounting, expenses are recorded in the period when their matching revenues are obtained.
In this case, even if the full interest will be paid at maturity, interest expense will still be recorded in each period according to the information that we are given in the question.
Interest expense to be recorded by December 31
5,200,000 * 0.12 = 624,000 / 2 = 312,000
Interest expense to be recorded by September 30
5,200,000 * 0.10 = 520,000 * 3/12 = 130,000
Interest expense to be recorded by October 31
5,200,000 * 0.09 = 468,000 * 4/12 = 156,000
Interest expense to be recorded by January 31
5,200,000 * 0.06 = 312,000 * 7/12 = 182,000
Answer:
The correct answer is letter "A": PCN.
Explanation:
In international staffing, a Parent Country National (PCN) is an employee that is hired to work in the same country from where the employee is resident and where the company has its headquarters. Usually, firms hire PCNs when foreign cultures are distant.
Answer:
The odds of being murder victims among nob white males are 5.485 times as compared to white males.
Explanation:
See attachment for explanation.
$13.50 170.2 142.5
Enter your responses rounded to two decimal places.
Based on the information above:
a. The 2010 real entry-level wage is $.
b. The 2003 real entry-level wage is $.
c. The 2003 nominal entry-level wage is $.
The 2010 real entry-level wage will be $7.93; the 2003 real entry-level wage is $8.43 and 2003 nominal entry-level wage is $12.01 for college graduates.
Using the information given above, the real entry-level wage for the year 2010 will be calculated by using the formula given below as,
Now, for the year 2003,
Now calculating the nominal entry-level wages for the year 2003,
Hence, the 2010 real entry-level wage will be $7.93; the 2003 real entry-level wage is $8.43 and 2003 nominal entry-level wage is $12.01 for college graduates.
Learn more about entry level wage rates here:
Answer:
Step 1: Identify the activities that generate costs
Step 2: Now we will find cost pools and their relevant cost drivers
Step 3: Assign the cost of each activity (cost pool) on a fair basis which is cost drivers
cost assigned to total products of A = (cost pool/total units of relevant cost driver consumed) *units of cost driver consumed by total # of Products A
Step 4: Divide the Answer from the step 3 by total units of product A produced to calculate unit cost
Step 5: Add prime cost per unit to it to calculate total unit cost of the product A
Explanation:
The costs in the ABC system are allocated to unit product on more fair basis than the tradition absorption costing which only assume one fair basis for allocation of overhead costs. ABC critisises traditional costing technique for using only one basis for absortion of Overheads.
Suppose both Mr. A and Mr. B drank 5 glasses of juices. Each glass of juice costs $4. According to the Traditional absorption costing technique each individual must pay:
(5 Juices/2)*$4=$10
But ABC says its unfair, use a more appropriate basis for cost allocation. So upon investigating we came to know that Mr. A drank 3 glasses of juice and Mr. B drank 2 glasses of juice. So Mr. A must pay $12(3*$4) and Mr. B must pay $8(2*$4). This is more appropriate or fair basis of absorbing the overhead cost to each individual and is Activity Based Costing.