Answer:
1/12
Step-by-step explanation:
P(5) = number of 5's on the die / total sides
P (5) = 1/6
P ( tails) = number of tails/ total
= 1/2
P (5, then tails)= P (5) *P ( tails)
= 1/6 * 1/2
= 1/12
Answer:
3 1/3
Step-by-step explanation:
Right side segments are proportional to left side segments:
5/6 = x/4
x = 4·5/6 = 3 1/3 . . . . . multiply by 4
O {x|1 < x < 4}
O {x|2 < x < 4}
Answer:
1.2 hours
Step-by-step explanation:
Given the following :
Time taken by Adam to shovel driveway = 2 hours
Time taken by BEV to shovel highway = 3 hours
How long will it take them working together
Hence Adam's rate of shoveling per hour :
Reciprocal of time taken = 1/2 per hour
BEV's rate will also be ;
1/ 3 per hour
If both work together ; that is combining the rate :
1/2 + 1/3 = (3 + 2) = 5/6
Combined rate = 5/6
Total fraction of shoveled area = 1:
Time taken = area / rate
= 1 ÷ (5/6)
= 1 × (6 / 5)
= 6/5
= 1 1/5 hours = 1.2 hours
3x-3/x^2-1* (x+2)(x+1)/x-1