The actual costs of camera, lens, and case could approximately be $795, $495, and $199 respectively, summing up to the total actual cost of $1,489.
In the question, Nadia's father estimated the cost of her camera, lens, and case to be $800, $500, and $200 respectively. However, the actual total cost of these three items was $1,489. Now, if he rounded the cost of each item, the actual cost of each item could be a bit less or more than the estimated costs. When you sum up the rounded cost of these three items ($800 + $500 + $200), it equals $1,500 which is $11 more than the actual total cost. The overestimation implies that the actual total cost ($1,489) might have been rounded up for one or more of the items. Therefore the actual prices could be something like: $795 for the camera, $495 for the lens, and $199 for the case. Summing these up will give you the actual total cost of $1,489.
#SPJ11
b. y=5x
c. y=23x
d. y=115x
Answer:c.y=23x
because A student spends the same amount each week for bus fare => in each week, he spents: 115 : 5 = 23 ($)
with x = the number of weeks, the equation shows this relationship is y = 23x
Step-by-step explanation:
Answer:
b
Step-by-step explanation:
Answer:
Step-by-step explanation:
Total cost = 1.9* 40 = 76.0 = $76
When unit rate is given,multiply.
The total cost of 1.9 cubic meters of soil is $76. This is calculated by multiplying the amount of soil bought (1.9 cubic meters) by the cost of one cubic meter of soil ($40).
To calculate the total cost, we have to multiply the amount of soil bought (in cubic meter) by the cost of one cubic meter of soil. Here, the student is buying 1.9 cubic meters of soil and the cost of one cubic meter of soil is $40.
So, Total cost = amount of soil * cost of one cubic meter of soil
= 1.9 * 40
= $76
Therefore, the total cost of 1.9 cubic meter of soil is "$76."
#SPJ2
7 5/12 hours
8 5/12 hours
8 1/2 hours
Answer:If you would like to know how many total hours did Jeff work today, you can calculate this using the following steps:
4 2/3 hours in the morning + 3 3/4 hours in the afternoon = 4 2/3 + 3 3/4 = 14/3 + 15/4 = 56/12 + 45/12 = (56 + 45) / 12 = 101/12 = 8 5/12 hours
Jeff worked 8 5/12 hours in total.
Step-by-step explanation: