Answer: W = 3500 J
Explanation: Work is the product of the amount of force and the perpendicular distance or W = Fd.
W = Fd
= 1400 N ( 2.5 m )
= 3500 J
Answer:
Force = 1400N
Displacement = 2.5 m
work done = F×D
=1400×2.5
= 3500 joule
Answer:
Average speed = 0.0075 m/s
Average velocity = 0.0025 m/s along forward direction
Explanation:
Speed is the ratio of distance and time and velocity is the ratio of displacement and time.
Distance traveled = 10 + 5 = 15 cm = 0.15 m
Displacement = 10 - 5 = 5 cm = 0.05 m
Time = 20 seconds
Average speed = 0.0075 m/s
Average velocity = 0.0025 m/s along forward direction
Hey!
---------------------------------------------------
Formula: Distance / Time = Speed
---------------------------------------------------
Solution:
Speed = 15/20 = 0.75cm/sec
Velocity = 5/20 = 0.25cm/sec
10 + 5 = 15 (distance traveled)
---------------------------------------------------
Answer:
Speed = 0.75cm/sec
Velocity = 0.25cm/sec going forward.
---------------------------------------------------
Hope This Helped! Good Luck!
Answer: Option B
Explanation:
When the thermal energy is transferred from a hotter body to the colder body then the transfer of energy takes place until the temperature of both the objects are same.
The energy from the hotter body is transferred to the colder body. Example: The heat transfer from the hotter water takes place into the colder water.
The energy transfer will stop only when the temperature of both the water will be same.
I'm like 98% it's D.