Answer:
68.26% probability that the number of jobs finished on time is within 1 standard deviation of the mean.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Looking at a random sample of 8 jobs that it has contracted, find the probability that x (number of jobs finished on time) is within one standard deviation of the mean.
Within 1 standard deviation of the mean is from Z = -1 to Z = 1. So this probability is the pvalue of Z = 1 subtracted by the pvalue of Z = -1.
Z = 1 has a pvalue of 0.8413
Z = -1 has a pvalue of 0.1587
So there is a 0.8413 - 0.1587 = 0.6826 = 68.26% probability that the number of jobs finished on time is within 1 standard deviation of the mean.
Answer: 0.0221
Step-by-step explanation:
We know that the formula to find the standard deviation of the sample proportion is :
, where p = proportion of success.
n= sample size.
As per given , we have
p=0.58
n= 500
Then, the standard deviation of the sample proportion in this situation would be :
Hence, the standard deviation of the sample proportion in this situation is 0.0221 .
First to give correct answer gets the brainliest, and hurry please this is timed
Answer;
equal;
Answer:
Cross section
Step-by-step explanation:
Cross section refers to the new two dimensional face exposed when we slice through a three dimensional objects.
It can also be the surface or shape exposed by making a straight cut through something, especially at right angles to an axis.
Cross section is the plane surface(two-dimensional objects) formed by cutting across a solid shape (three-dimensional shape) especially perpendicular to its longest axis.
Answer:
0.3216 = 32.16% probability that, in any seven-day week, the computer will crash less than 3 times
Step-by-step explanation:
In a Poisson distribution, the probability that X represents the number of successes of a random variable is given by the following formula:
In which
x is the number of sucesses
e = 2.71828 is the Euler number
is the mean in the given time interval
Mean of 0.5
7-day week, so
What is the probability that, in any seven-day week, the computer will crash less than 3 times?
In which
0.3216 = 32.16% probability that, in any seven-day week, the computer will crash less than 3 times
To find the probability that the computer will crash less than 3 times in a seven-day week, we can use the binomial probability formula.
To find the probability that the computer will crash less than 3 times in a seven-day week, we can use the binomial probability formula. The formula for binomial probability is:
Where:
In this case, the mean number of crashes per day is 0.5, which means the probability of a crash in a single day is 0.5. Since we're interested in the probability of less than 3 crashes in a seven-day week, we can calculate P(X < 3) using the binomial probability formula with n = 7, p = 0.5, and k = 0, 1, 2:
P(X < 3) = P(X = 0) + P(X = 1) + P(X = 2)
Using the binomial probability formula, we can calculate:
Adding these probabilities together will give us the probability of less than 3 crashes in a seven-day week.
Rounding the final probability to four decimal places, we get the probability that the computer will crash less than 3 times in a seven-day week.
#SPJ12
Answer:
y = x + 15
Step-by-step explanation:
I tried all of them but that one works. U can try it on each number. Brainliest plz! Hope this helps!
Answer:
Y=2x is the answer
Step-by-step explanation:
8x=4x−32
A)x = 8
B)x = 4
C) x=−4
D) x=−8
Answer:
x=-8
Step-by-step explanation:
i took the quiz
Answerd
Step-by-step explanation: