Answer:
a) the probability of waiting more than 10 min is 2/3 ≈ 66,67%
b) the probability of waiting more than 10 min, knowing that you already waited 15 min is 5/15 ≈ 33,33%
Step-by-step explanation:
to calculate, we will use the uniform distribution function:
p(c≤X≤d)= (d-c)/(B-A) , for A≤x≤B
where p(c≤X≤d) is the probability that the variable is between the values c and d. B is the maximum value possible and A is the minimum value possible.
In our case the random variable X= waiting time for the bus, and therefore
B= 30 min (maximum waiting time, it arrives 10:30 a.m)
A= 0 (minimum waiting time, it arrives 10:00 a.m )
a) the probability that the waiting time is longer than 10 minutes:
c=10 min , d=B=30 min --> waiting time X between 10 and 30 minutes
p(10 min≤X≤30 min) = (30 min - 10 min) / (30 min - 0 min) = 20/30=2/3 ≈ 66,67%
a) the probability that 10 minutes or more are needed to wait starting from 10:15 , is the same that saying that the waiting time is greater than 25 min (X≥25 min) knowing that you have waited 15 min (X≥15 min). This is written as P(X≥25 | X≥15 ). To calculate it the theorem of Bayes is used
P(A | B )= P(A ∩ B ) / P(A) . where P(A | B ) is the probability that A happen , knowing that B already happened. And P(A ∩ B ) is the probability that both A and B happen.
In our case:
P(X≥25 | X≥15 )= P(X≥25 ∩ X≥15 ) / P(X≥15 ) = P(X≥25) / P(X≥15) ,
Note: P(X≥25 ∩ X≥15 )= P(X≥25) because if you wait more than 25 minutes, you are already waiting more than 15 minutes
- P(X≥25) is the probability that waiting time is greater than 25 min
c=25 min , d=B=30 min --> waiting time X between 25 and 30 minutes
p(25 min≤X≤30 min) = (30 min - 25 min) / (30 min - 0 min) = 5/30 ≈ 16,67%
- P(X≥15) is the probability that waiting time is greater than 15 min --> p(15 min≤X≤30 min) = (30 min - 15 min) / (30 min - 0 min) = 15/30
therefore
P(X≥25 | X≥15 )= P(X≥25) / P(X≥15) = (5/30) / (15/30) =5/15=1/3 ≈ 33,33%
Note:
P(X≥25 | X≥15 )≈ 33,33% ≥ P(X≥25) ≈ 16,67% since we know that the bus did not arrive the first 15 minutes and therefore is more likely that the actual waiting time could be in the 25 min - 30 min range (10:25-10:30).
Answer:
Step-by-step explanation:
Step 1: Cross-Multiply
What cross multiply basically means is that you take both sides of the equation and you multiply my the opposite sides. So you take the top of the left fraction and multiply it by the bottom of the right fraction. You then have an equal sign and then have the bottom of the left fraction multiplied by the top of the right fraction.
Step 2: Distribute
Step 3: Subtract 8x from both sides
Step 4: Divide both sides by 34
Answer:
192 square centimeters
B.
108 square centimeters
C.
102 square centimeters
D.
42 square centimeters
Labor time = 6 hours
Retail price of parts = $0
Total job cost = $86.00
Overhead rate?
Answer:
Overhead rate = $6.3
Step-by-step explanation:
Given : Labor rate = $8.00 per hour
Labor time = 6 hours
Retail price of parts = $0
Total job cost = $86.00
To find : Overhead rate
Solution:
Overhead cost = Total Cost - The cost of all inputs
The Overhead Rate is this number divided by total labor hours.
Total job cost = $86.00
Labor Cost = labor rate × labor time = 8 × 6 = $48
Retail price of parts:$0
Overhead Costs = total cost - labor cost= $86 - $48 = $38
Now, we divided overhead cost by labor hours to get overhead rate,
Overhead Rate
Therefore, Overhead rate is $6.3
Answer:
55.8
Step-by-step explanation:
8x6= 48
48/86 into percent= 55.814%
therefore it would be rounded to 55.8