Answer:
Overhead rate = $6.3
Step-by-step explanation:
Given : Labor rate = $8.00 per hour
Labor time = 6 hours
Retail price of parts = $0
Total job cost = $86.00
To find : Overhead rate
Solution:
Overhead cost = Total Cost - The cost of all inputs
The Overhead Rate is this number divided by total labor hours.
Total job cost = $86.00
Labor Cost = labor rate × labor time = 8 × 6 = $48
Retail price of parts:$0
Overhead Costs = total cost - labor cost= $86 - $48 = $38
Now, we divided overhead cost by labor hours to get overhead rate,
Overhead Rate
Therefore, Overhead rate is $6.3
Answer:
55.8
Step-by-step explanation:
8x6= 48
48/86 into percent= 55.814%
therefore it would be rounded to 55.8
2x + 2y = 2
(3, 4)
(-4, 5)
(2, -1)
Solution :
Given equations,
Applying Substitution method to solve the equation.
Solve the first equation for x,
Substitute the value of x in second equation,
To calculate the value of x substitute the value of y in first equation
Hence, the solution of the equations is (2,-1).
Answer:
64 ivy stems.
Step-by-step explanation:
Given:
A wedding planner uses 72 ivy stems for 18 centerpieces.
When she arrives at the venue, she realizes she will only need 16 centerpieces.
Question asked:
How many ivy stems should she use so that the ratio of ivy stems to centerpieces stays the same?
Solution:
As wedding planner uses 72 ivy stems for 18 centerpieces:
Ratio of ivy stems to centerpieces =
As she realizes that she needs only 16 centerpieces:
Let ivy stems should be used to stays the ratio same =
Now, to do the ratio same:-
Old ratio =
New ratio =
To do the ratio same:-
By cross multiplication:
Dividing both sides by 18
Therefore, 64 ivy stems she should use so that the ratio of ivy stems to centerpieces stays the same.
-3y+4=-11
O -2/5
O 2/5
O 5/2
None of the above
Answer:
2/5
Step-by-step explanation: