Answer:
27 children.
Step-by-step explanation:
We are told that at the newest animated movie, for every 9 children, there are 4 adults. There are a total of 39 children and adults at the movie.
We can see that number of children is proportional to number of adults. So we will use proportions to solve for number of children at the movie.
Let us substitute number of children and adults in our proportion.
Multiply both side of equation by 39.
Therefore, 27 children are at the movie.
Answer: Here's my answer
Step-by-step explanation:
The relationship given, 27, is neither linear nor exponential.
In a linear relationship, the dependent variable (y) changes at a constant rate for every unit increase in the independent variable (x). This results in a straight line when plotted on a graph. However, the given value, 27, does not provide any information about how the variable changes in relation to another variable. Without this information, we cannot determine if the relationship is linear.
In an exponential relationship, the dependent variable (y) changes at an increasing or decreasing rate based on a constant ratio for every unit increase in the independent variable (x). This results in a curved line when plotted on a graph. Since the given value, 27, does not provide any information about the rate of change or the constant ratio, we cannot determine if the relationship is exponential.
Therefore, based on the given information, the relationship 27 is neither linear nor exponential.
Answer:
5265 mins or 87.75 hours
Step-by-step explanation:
There is a large amount of data in this question so we will first process it and simplify it
Given
Order = 50 units
Operation A
Setup Time = 45 mins
Run Time = 5 min/unit * 50 = 250 mins
Wait Time (Between A&B) = 8 hours = 480 mins
Move Time (Between A&B) = 60 mins
Queue Time = 25 hours = 1500 mins
Operation B
Setup Time = 30 mins
Run Time = 4 min/unit * 50 = 200 mins
Wait Time (After B) = 8 hours = 480 mins
Move Time (To Stores) = 2 hours = 120 mins
Queue Time = 35 hours = 2100 mins
Lead time refers to how long it takes from when the order is place to when it is delivered, so to calculate the total manufacturing lead time we will add all the above times which is 5265 mins or 87.75 hours
Answer: ~ 34.15%
Step-by-step explanation:
To calculate the percent error for the amount of snowfall, you can use the following formula:
Percent Error = [(|Estimated Value - Actual Value|) / Actual Value] * 100%
In this case, the estimated snowfall is 6.75 inches, and the actual snowfall is 10.25 inches. Plugging these values into the formula:
Percent Error = [(|6.75 - 10.25|) / 10.25] * 100%
Percent Error = [(3.5) / 10.25] * 100%
Percent Error ≈ 34.15%
So, the percent error for the amount of snowfall is approximately 34.15%. This means that the estimated snowfall was about 34.15% lower than the actual snowfall.
Answer:
x = -1 and x = -3
Step-by-step explanation:
GIven the graph of the function y = f(x), where the problem asks for the value of x when f(x) = -6:
Looking at the graph where the value of the y-coordinate is -6, it shows that it has two corresponding x-ccordinates: x = -1, and x = -3 Therefore, the value of x when f(x) = -6 is x = -1 and x = -3.
Please mark my answer as the Brainliest, if you find this helpful :)