95°
50°
27°
Answer:
She will owe $500 after 4 payments.
Step-by-step explanation:
With the help of graph
Number of payments (x) Balance remaining(y)
0 2500
1 2000
2 1500
Since it is linear function .
So, we will use two point slope form to find the equation for the given situation.
----A
Substitute the values in A
Where x is the number of payments
y is the remaining payment
This equation represents the given situation.
So, to find the amount remaining after 4 payments .Substitute x =4
Hence she will owe $500 after 4 payments.
Answer:
She will owe $500
Step-by-step explanation:
If cold water pipe is turned on and hot water pipe is turned on 3 hours later then it will take 36 minutes (or 0.6 hr) to them to fill the pool together.
Step-by-step explanation:
Given :
Cold water pipe can fill a swimming pool in 4 hours, and a hot water pipe in 6 hours.
Solution :
Let's say the swimming pool is x gallons.
The flow rate of the cold water pipe is,
The flow rate of the hot water pipe is,
If the cold water pipe is turned on for three hours, the volume of water is:
The time to fill the rest of the pool with both the cold and hot water pipes is,
= 0.6 hr
If cold water pipe is turned on and hot water pipe is turned on 3 hours later then it will take 36 minutes (or 0.6 hr) to them to fill the pool together.
For more information, refer the link given below
Answer:
0.6 hours
Step-by-step explanation:
Let's say the swimming pool is 12,000 gallons.
The flow rate of the cold water pipe is:
12000 gal / 4 hr = 3000 gal/hr
The flow rate of the hot water pipe is:
12000 gal / 6 hr = 2000 gal/hr
If the cold water pipe is turned on for three hours, the volume of water is:
3000 gal/hr × 3 hr = 9000 gal
That leaves 3000 gallons. The time to fill the rest of the pool with both the cold and hot water pipes is:
3000 gal / (3000 gal/hr + 2000 gal/hr) = 0.6 hr
It takes 0.6 hours (36 minutes).